Program: Cluster
European scientific program. The 4 satellites composing it were lost on
Ariane
5's maiden flight.
The total cost was evaluated at 440 million Euros.
http://www.esoc.esa.de/external/mso/cluster.html
Prime
contractor
|
Astrium
(was Dornier)
|
Platform
|
|
Mass
at launch
|
1200
kg
|
Payload
mass
|
72
kg
|
Propellant
mass
|
650
kg
|
Dry
mass
|
550
kg
|
Diameter
|
2.9
m
|
Height
|
1.3
m
|
Solar
array
|
|
Stabilization
|
spin
stabilized (15 rpm)
|
DC
power
|
EOL:
224 W (80 Ah silver cadmium batteries)
|
Payload
power
|
47
W
|
Design
lifetime
|
2
years
|
Telemetry
|
2-262
kbps
|
Tape recorder capacity: 1 gbit The final orbit was to be 25000/140000 km
Cluster
1
|
2242.000
MHz
|
Cluster
2
|
2249.000
MHz
|
Cluster
3
|
2277.000
MHz
|
Cluster
4
|
2270.000
MHz
|
STAFF ( Spatio-Temporal Analysis of Field Fluctuations)
EFW (Electric Fields and Waves)
WHISPER (Waves of High frequency and Sounder for probing of density by
Relaxation)
WBD (Wide Band Data)
DWP (Digital Wave Processor)
FGM (Fluxgate Magnetometer)
EDI (Electronic Drift Instrument)
CIS (Cluster Ion Spectrometry)
PEACE (Plasma Electron And Current Analyser)
RAPID (Research with Adaptive Particle Imaging Detectors)
ASPOC (Active Spacecraft Potential Control)