Designation | 39157 / 13020A |
Launch date | 1 May 2013 |
Country of origin | China |
Mission | Telecommunications |
Geostationary orbit | see below |
Launch vehicle | Long March #168 |
Begin | End | Position |
L: 1 May 2013 | Aug 2013 | 163°E |
Oct 2013 | Apr 2014 | 115.5°E |
May 2014 | 98°E |
Prime contractor | CAST |
Platform | DFH 4 |
Mass at launch | approx 5000 kg |
Payload mass | |
Dimension | |
Solar array | |
Stabilization | 3-axis |
DC power | EOL: 10.5 kW |
Design lifetime | 15 years |
Main transponders | |
Backup transponders | |
Power | |
Bandwidth | |
Coverage | All of Asia and Middle East |
EIRP max | |
G/T max | |
Polarization | linear |
Main transponders | |
Backup transponders | |
Power | |
Bandwidth | |
Coverage |
Indonesia
beam South East Asia beam Steerable beam Maritime beam |
EIRP max | |
G/T max | |
Polarization | linear |