| Designation | 23323 / 94068A |
| Launch date | 15 Oct 1994 |
| Country of origin | India |
| Mission | Remote sensing |
| Perigee/Apogee | 818/820 km |
| Inclination | 98.7° |
| Period | 102.3 min |
| Launch vehicle | PSLV #2 |
| Prime contractor | ISRO |
| Platform | IRS P |
| Mass at launch | 870 kg |
| Mass in orbit | |
| Length | |
| Width | |
| Height | |
| Stabilization | 3-axis |
| DC power | |
| Design lifetime |
| Wavebands |
0.45-0.52
µm (visible): sedimetation and coastal studies 0.52-0.59 µm (visible): vegetation. rock and soil discremination 0.62-0.68 µm (visible): chlorophyll absorption in vegetation. rock/soil 0.77-0.86 µm (IR): moisture in vegetation. land/water discremination |
| Resolution | 32 x 37 m |
| Swath width | 67 km |