Monitor E
After an orientation problem, control was lost on 18 Oct 2005. It was regained
in late December.
Still operating in 2010.
sat-index articles
Prime
contractor
|
Krunichev
|
Platform
|
Yakhta
|
Mass
at launch
|
750
kg
|
Dry
mass
|
|
Dimension
|
1.2
m high
|
Solar
array
|
|
Stabilization
|
|
DC
power
|
|
Design
lifetime
|
5
years
|
Carries 2 optical cameras with 8 and 20 m resolution.
Wavebands
|
0.546-0.843
µm
|
Resolution
|
8
m
|
Swath
width
|
90
km within 780 km
|
Wavebands
|
0.528-0.585
µm
0.626-0.672 µm
0.783-0.883 µm
|
Resolution
|
20
m
|
Swath
width
|
160
km within 890 km
|