Nilesat 101
Also called Nilesat 1
On the contract: 2 satellites + 2 earth stations on the contract: total amount:
$158 million for Matra Marconi Space.
Telesat Canada provided the consultancy to setup the whole system.
Out
of service
|
Feb
2013
|
Cause
|
sent
to the junk orbit
|
sat-index articles
Lyngsat
transponder loading
EIRP coverage (dBW)
Prime
contractor
|
Matra
Marconi Space
|
Platform
|
Eurostar-2000
|
Mass
at launch
|
1840
kg
|
Mass
in orbit
|
1100
kg
|
Dry
mass
|
795
kg
|
Dimension
|
2.3
x 2.4 x 1.7 m
|
Solar
array
|
21.5
m span
|
Stabilization
|
3-axis
|
DC
power
|
3750
W
|
Design
lifetime
|
16
years
|
Main
transponders
|
12
|
Backup
transponders
|
6 |
Power
|
105
W
|
Bandwidth
|
33
MHz
|
Coverage
|
Middle East & North Africa
|
EIRP
max
|
50.3
dBW
|
Polarization
|
linear
H/V
|
Frequencies
|
downlink:
11.7 - 12.5 GHz
|
2.3 m diameter onboard antenna
Payload provided by Alcatel Espace
NileSat 101 reception is far better than predicted: reception in London was
predicted with 4.5 m dish but only 1.2 m ones are required. As far as the
Arabian Gulf is concerned, viewers in Oman can receive signals on 90cm
dishes.
Transponder
|
Polarization
|
Frequency
|
2
|
V |
11.747
|
3
|
H |
11.766
|
4
|
V |
11.785
|
5
|
H |
11.804
|
6
|
V |
11.823
|
7
|
H |
11.842
|
8
|
V |
11.861
|
9
|
H |
11.881
|
10
|
V |
11.900
|
11
|
H |
11.919
|
12
|
V |
11.938
|
13
|
H |
11.957
|
14
|
V |
11.956
|
15
|
H |
11.996
|
16
|
V |
12.015
|
17
|
H |
12.034
|
18
|
V |
12.053
|