Step 4
Also called P95-1
Cost: $52 million
Out
of service
|
22
Oct 1997
|
Cause
|
Contact
was lost right after launch and the solar panels did not deploy. In such
conditions the lifetime of the satelllite is limited by the batteries.
|
sat-index articles
Prime
contractor
|
TRW
|
Platform
|
STEP
|
Mass
at launch
|
391.5
kg
|
Mass
in orbit
|
|
Dimension
|
1.52
x 0.91 m
|
Solar
array
|
|
Stabilization
|
3-axis
|
DC
power
|
183
W
|
Design
lifetime
|
2
years
|
S-band telemetry
Digital Ion Drift Meter (DIDM)
Electromagnetic Propagation Experiment (EMPE)
Orbiting Ozone and Aerosol Measurement (OOAM)